• ECODynamic Solutions (EDS) Inc.
  • 214 — 2459 Cousins Ave
  • Courtenay, BC V9N 3N6
  • (250) 334-3039

Clean Energy BC’s Generate 2014 Conference Announces Project of the Year Recipients

The Generate 2014: More Than Electrons conference recently announced Forrest Kerr Hydroelectric Project  and Kwoiek Creek Hydroelectric Project as the Projects of the Year.  ECODynamic Solutions (EDS) Inc.  is thrilled to have been involved as the Independent Environmental Monitor (IEM) on both projects and sends congratulations to both licensees.

The Clean Energy BC (CEBC) excellence award is intended to recognize excellence in project development, construction or operations. Available to operating companies only, this award is intended to recognize the value of teamwork in project execution. The criteria for choosing the recipients was focused on excellence in development, construction or operation based on the quality of the accomplishment, ability to meet budget, schedule, and performance criteria.

Generate 2014 is Clean Energy BC’s (CEBC’s) annual fall conference that brings together all stakeholders involved in the Clean Energy industry in British Columbia.  This year will be CEBC’s 12th annual conference which has grown significantly in past years.  Generate 2013 had 85 exhibitor companies and over 900 delegates passed through the doors by attending field trips, short courses, panel or plenary sessions.   It is the only conference of its kind in British Columbia each year.  The conference will be held at the Hyatt Regency Hotel in Vancouver, BC – 655 Burrard Street.GenerProject.  EDS is proud to be a Gigawatt sponsor of the conference.

For more info check out: http://www.generate2014.ca/